Servicing greater Perth and Western Australia.

Existing 30m high Scrubber Stack

Existing 30m high Scrubber Stack

The existing stack was severely corroded at the base. Sections of the stack wall were completely corroded through.  Following site measurements the stack was modelled using FEA to determine the best approach to strengthening the Stack. The base of the stack was extensively strengthened to ensure that it complied with relevant Australian Standards.